Shimano CUES FC-U6030-2 Crankset - 170mm 9/10-Speed 46/32t Asymmetric 110 BCD BLK G2 Ultimate Caliper features Bleeding Edge bleed J593721 Rail Length:145Mm RaceFace Chester Stem 50mm MFPN=30355427125
Gallery
Price
Pay in 4 interest-free payments of $20.00 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Nov 20 - Nov 25
Size & cart
Cabinet notes
Description
Shimano CUES FC U6030 2 Crankset 170mm 9 10 Speed 46 32t Asymmetric 110 BCD BLK G2 Ultimate Caliper features Bleeding Edge bleed J593721 Rail Length:145Mm RaceFace Chester Stem 50mm MFPN=30355427125 Caliper features Bleeding Edge bleed port for drip free maintenance Brake Lever Actuation Hydraulic Brake Caliper Type Post Mount Rotor Included No Brake Lever Use Left or Right Color Polished Black anodized Hydraulic Fluid Type Mineral Oil Pad Compound Organic Hydraulic Hose Length 2000 Adjustable Reach Yes Adjustable Contact Point No Position Rear Front Hose Length 2000Mm Rotor diameter front back: 160 160 mm
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
Frequently Asked Questions for Shimano CUES FC-U6030-2 Crankset - 170mm 9/10-Speed 46/32t Asymmetric 110 BCD BLK G2 Ultimate Caliper features Bleeding Edge bleed J593721 Rail Length:145Mm RaceFace Chester Stem 50mm MFPN=30355427125
What should I check about requirements or limitations before purchasing?
Ask about a necessary capability when the description does not address it. Make the purchase decision on verified conditions rather than assuming exceptions will be available.
How should I interpret a product labeled as recommended?
Ask about missing information essential to your intended use. Recheck the selected version before accepting the recommended configuration.
What should I verify before marking a support request as resolved?
Confirm that any promised next step has occurred when applicable. Describe any unresolved part clearly before agreeing to closure.